
|
The Presidential Museum project was situated in Block 1 of the Original Town Plat of Springfield. In 1854, this area was improved with a series of early, presumably upscale houses. The three areas highlighted in yellow represent the areas investigated archaeologically during the multi-year Presidential Library and Museum project. From bottom to top they include the Library (Block 12), the Museum (Block 1), and the Parking Garage (Block 2; Ninian Edwards Addition to Springfield).
![]()
HOME PROJECTS RESEARCH PHOTO GALLERY PERSONNEL ABOUT US LINKS